Northrop Grumman Office Building Addition
Salt Lake City, UT
Having provided previous commissioning services to Northrop Grumman for local facilities, we were asked to commission an office building addition at their facility in Salt Lake City, Utah. The building is two stories in height, ±52,000 square feet, and will be LEED™ certified in accordance with LEED™ New Construction V 3.0 checklist and coordinated with the LEED™ Coordinator. Complete Commissioning provided LEED™ Fundamental Commissioning to meet EA Prerequisite 1, LEED™ New Construction V 3.0.
In addition to the required LEED Fundamental Commissioning tasks, we were also asked by the Owner to prepare a Measurement and Verification Plan, and provide calculation and documentation for the targeted LEED credits to assist the Owner in LEED document upload.
Systems Commissioned Include:
- Air Cooled Chillers
- Chilled Water Piping Systems
- Air Handlers
- Building Automation Systems
- Gas Fired Condensing Boilers
- Steam Boilers
- Deaerator Tanks
- Electric Humidifier Systems and Controls
- Steam Humidifier Systems and Controls
- Test and Balance
- AC Motors and Drives
- Exterior Lighting Systems
- Interior Lighting Systems
- Lighting Controls & BAS Interface