Kaiser Permanente Station Place Building 3 Tenant Fitout

Phases 1, 2 & 3

Washington, DC

Location of Project: Washington DC
Owner: Kaiser Permanente
Owner Address: 2101 East Jefferson Street, Rockville, MD 20852
Owner Representative: Louis Dreyfus Property Group – Ted Hallinan
Owner Phone Number: 202-470-4884
Date Awarded: February 2010
Date Complete: Est. 02/2011
General Contractor: DPR Construction – Salim Saherwala & Will Morrison
Commissioning Authority: Complete Commissioning, Inc.
Mechanical Engineer/Designer: Mazzetti Nash Lipsey Burch
Controls Contractor: Siemens
Mechanical Contractor: Pro-Air – Matt Fuller
Electrical Contractor: Varcomac Electrical Construction
Additional Pertinent Team Members:
TAB Contractor: Environmental Balancing Company – Ray Hardesty

Scope of services for the project is as follows:

  • OPR and BOD review and comments
  • Design Phase Commissioning Plan 
  • GMP Construction Document Review
  • Pre Commissioning Construction Kick Off Meeting
  • PFT and FPT forms preparation
  • Commissioning RFI and Open Issue  Logs
  • Commissioning Construction Phase Meetings and Minutes
  • O&M manual review
  • Pre Functional Checklist Field Verification 
  • TAB Verification 
  • Functional Performance Test Verification
  • System Manual Review
  • Training verification

Final Commissioning Report

Complete Commissioning, Inc. was contracted directly by the owner for commissioning services via existing client relationship.
Project is a tenant specific fit out for medical office application at an existing LEED Silver Certified building. Area of fit out includes 160,000 square feet of the building’s 500,000 square feet. The areas of tenant fit out include four floors (Ground, Concourse, 6th and 7th) in the Station Place Building 3. Program elements include a comprehensive radiology suite and a pharmacy on the concourse level, a conference facility on the ground floor, exam rooms, procedure rooms, physician office and support spaces on the 6th and 7th floors. MEP systems will have extensive upgrades to support Kaiser Permanente’s functional use of the existing building. Complete Commissioning performed design and construction phase commissioning in accordance with NEBB standards.

Systems commissioned include:

  • Existing Systems:  AHUs, Cooling Tower, VAV boxes, Humidifier, duct heaters as indicated for Phase 3.
  • Air Handling Units New to project for Kaiser Permanente Fit Out
  • Centrifugal and Reciprocating Water Cooled Chillers
  • Computer Room Air Conditioning Units
  • HVAC System Pumps
  • Exhaust fans
  • Fan Coil Units
  • VAV Terminal Units for each phase 
  • HVAC Control System
  • DDC System and DDC System Controllers
  • Duct System Installation all phases
  • Piping System Installation all phases
  • Humidifier
  • Water to Water Heat Pump Unit
  • Heat Exchanger
  • Condenser Water System
  • Chilled Water System
  • Sanitary Piping System
  • Plumbing Systems
  • Medical Gas System verification of certified testing done by others.
  • Water Heaters
  • Domestic Hot Water Circulators
  • Generator and Fuel Oil Systems
  • Smoke Detectors 
  • Fire/Smoke Dampers
  • Lighting Control Systems – for spaces indicated on GMP plans
  • Lighting Systems
  • Low voltage distribution system
  • Emergency Power System
  • UPS System
  • Fire Alarm System
  • Nurse Call Room Status/Emergency Call System
  • Television System
  • Sound Masking System
  • Audio/Visual System

Contact Us